Every project is unique. What they share is an opportunity to learn, improve and progress as head contractors.

We’re at our best when we plan ahead. It’s how we deliver a seamless project delivery on-site, every time.

Selected projects

RAAF Glenbrook Building Works

Staged refurbishment of a prized heritage building in a live operational environment

RAAF Glenbrook Building Works involved refurbishment of the heritage significant Officers' Mess, four Live-In-Accommodation blocks and the Pool House at RAAF Glenbrook.

Baseline led a team of specialist subcontractors to refurbish the original art deco building, bringing it up to modern standards including installation of a new commercial kitchen and new air-conditioning system. In the process, Baseline completed hazmat remediation and refurbishment of over 200 heritage windows and doors.

ANZ Goulburn

One of the first realisations of an innovative nationwide fitout for a trusted client

Baseline worked with JLL to deliver the first roll-out of ANZ's award winning retail design "Breathe" in NSW. Attention to detail and finding solutions to technical detailing problems were key in bringing the innovative modular design to life.

HMAS Albatross Navy METS

A complex, high risk installation seamlessly delivered through meticulous planning

Baseline completed structural upgrades to support the replacement of the METS training facility at HMAS Albatross. Three months of detailed planning and risk workshops were undertaken to develop a delivery methodology that safely bought together the complex technical sequencing of multiple high-risk construction activities.

HMAS Albatross Oasis Mess

Major refurbishment of a building at the heart of the HMAS Albatross community

The Oasis Mess project involved internal and external upgrades of a tired 1960's building. The external fabric was brought up to modern environmental standards with replacement of the roof and windows. Interior works included major services upgrades, refurbishment of the commercial kitchen and new finishes throughout. Baseline worked closely with stakeholders to ensure that historic artworks were safely handled, stored and reinstated in the refurbished space.

RAAF Richmond STP

Refurbishment and critical infrastructure upgrades of the RAAF Richmond Sewage Treatment Plant.

The STP project is highly varied and required a number of specialist technical trades. Works include electrical infrastructure upgrades such as MSB and DBs, as well as hazmat remediation, refurbishment of electric motors and gearboxes, concrete remediation, polyurea membrane works and relining of effluent ponds.

HMAS Waterhen

A diverse project scope, delivered to a tight program with a focus to minimise disruptions for local stakeholders

Planning and communication were critical in completing the works at HMAS Waterhen. Baseline worked closely with base stakeholders and industry to develop a program that navigated unprecedented supply chain issues without negatively impacting ongoing Defence operations. Works packages included fire services and compliance upgrades, workplace fitouts, new steel balustrades and roof replacement.

Projects Map

Projects

ANZ Goulburn
HMAS Albatross Navy METS
HMAS Albatross Oasis Mess
HMAS Penguin Building Refurbishments
HMAS Waterhen
Holsworthy EOR and MTR Ranges
NDIS Parramatta
Old Juniors Demolition
RAAF Glenbrook Building Works
RAAF Richmond STP
Singleton Ranges
TAFE NSW ARP Uplift Program